
six cups max 500kg vacuum battery glass lifters
Product Description
1, HP-GX sequence of gear are extensively employed in glass changeover and glass curtain wall installation.
2, CZPTican THOMAS DC vacuum pump and CZPT DC battery are adopted Throughout employing, there is no need to join other air supply or electricity resource.
3, Electronic display vacuum pressure change and battery charge indicator, which can keep an eye on secure operation of equipment far more evidently.
4, With vacuum strain charging method, equipment can make certain the total vacuum system inside a comparatively consistent protected pressure worth during transition.
| Product | HP-GX-6S |
| Power Method | DC12V |
| Safety Loading | 500kg |
| Function | Flip ninety degrees (Manual), Rotate 360 degrees (Handbook) |
| Overall Dimension | 1800*1190*240mm |
| Excess weight | 130kg |
Information
CZPT&CZPT
Packing Specifics : 1.Straightforward extend movie packaging
2.Professional export wood packing
Shipping Information : fifteen-twenty Days after obtain the first deposit.
Our Services
Before payment
Free of charge contact for the most ideal machine
Free professional design for every client particularly.
Following sale services
24 hours technical support by phone, email or (electronic mail or ) .
1years guarantee period of time
Our senior engineer is available to journey aboard, help the set up, upkeep and coaching workers.
By giving this support, we make sure the cutomer commence the enterprise smoothly, to realise earn-win cooperation.
Payment
L/C, thirty% deposit by T/T,70% spare payment L/C.
T/T, thirty% deposit by T/T,70% spare payment ahead of cargo.
CZPT CZPT or Paypal.
FAQ
1. When can we arrange shippment?
We normally organize shippment within 20 times after receiving deopsit,
but CZPT devices need to be much more than twenty five times.
2.What you can do if my devices have difficulties?
1) We can send out you free of charge parts to you if your devices are in assure time.
two) We can send our engineers to repair your devices
3.Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passport.
four.If our price is higher than another company or factories ?
A:Please check, what is different with the machine,service and guarantee,especially the machine inner electric parts, sometimes, if machine is breakdown, the most reason is the machine inner electric parts problem, but we use the CZPT and reliable parts for the machines inside.
