
CZPT-parameter van CZPT
| CZPT-naam | Benzine-vloeistof boosterpomp | |
| Ontwerp | M-vier | |
| Booster Medium | Vloeistof | |
| Krachtverhouding | 4:1 | |
| Uitlaatstress | 32 bar | |
| 464 psi | ||
| Circulation L/Min | veertien.81 | |
| verbindingen | CZPT-relatie | G3/8” |
| Inlaat | OG1” | |
| Outlet | ZG1/2” | |
| Internet fat KG | vier.8 | |
| CZPT-instanties | Export CZPT fumigation wood situations | |
Productintroductie
M-Collection air driven liquid pump uses a developed-in pneumatic management four-way two-placement valve to shift to and fro routinely. This series of product is created by introducing relevant technological innovation abroad and designing in accordance to the CZPTs of our place. The air pushed parts are all manufactured of aluminum alloy and are taken care of with oxidation. The pump head is produced of carbon metal or stainless steel according to diverse media.
Artikeldetails
De diameter van de aandrijfzuiger in deze reeks bedraagt maximaal 80 mm, luchtdruk ≤ 8 bar.
This kind of pumps has the following characteristics:
Light fat, portable design
Big flow, vast force range
Apt to management, equally handbook and computerized controls are available.
Geschikt voor de meeste vloeistoffen
No electric power is needed.
Easy to preserve
Major technological data
Normal technological information for M sequence air pushed- booster pump
| Vriendelijk | Krachtverhouding | Uitlaatdruk | Bloedsomloop 1/min |
Verbindingen | Net weight KG | |||
| bar | psi | generate link | Inlaat | Outlet | ||||
| M4 | 4:1 | 32 | 464 | 14.81 | G3/acht” | G1″ | ZG1/twee” | vier.acht |
| M10 | 10:1 | tachtig | 1160 | zeven.07 | G3/8″ | ZG3/vier” | ZG1/twee” | vier.3 |
| M16 | sixteen:1 | 128 | 1856 | four.fifty five | G3/8″ | ZG1/2″ | ZG1/twee” | vier.2 |
| M30 | 30:one | 240 | 3480 | 2.22 | G3/acht” | ZG1/2″ | ZG3/acht” | 4.twee |
| M44 | 44:1 | 352 | 5104 | 1.36 | G3/8″ | ZG3/acht” | ZG3/acht” | vier.1 |
| M64 | 64:1 | 512 | 7424 | .seventy two | G3/acht” | ZG3/acht” | ZG3/8″ | vier.één |
| M100 | a hundred:one | 800 | 11600 | .48 | G3/8″ | ZG3/acht” | M14X1.5 | vier.1 |
| M170 | 170:1 | 1360 | 19720 | .28 | G3/acht” | ZG3/8″ | M14X1.5 | vier.één |
Onze fabriek
Veelgestelde vragen
1. Verzending en levering CZPT: FOB Hangzhou, per schip
two. Supply Time: 15-twenty days
3. Payment CZPTs: T/T (a hundred% to shell out by T/T )
4. Installation / Procedure / Service / Handbook: In English
5. Guarantee: One particular 12 months from the date of completion of the commissioning.
6. Pre-shipment Inspection: Supplier must demo operate whole line at supplier’s factory just before shipment.
Over levering
Fumigation picket circumstances, which are nicely sealed and robust adequate for prolonged-phrase trip, and appropriate for multi-instances loading & unloading by forklift.
