
PVC WPC Crust Foam Board Creating Extrusion CZPT
Technical specs
1, Constructing WPC Board CZPT
two, Thickness: 3-30mm
three, Width: 1220mm
four, CE, ISO9001
Primary CZPT Parameter
one, Conical double screw extruder SJSZ-eighty/156
A) Output: three hundred-400kg/h
B) Transmission technique:
Large torque output vertical reducer equipment box
Construction: Vertical
Offered with outside-circulation cooling system
CZPTed thrust bearing and large-torque output
Substance of Gear: 20CrMnTi, with equipment grinding technological treatment method and cementite
two, Mold
A) Structure: Unique design for PVC WPC board
B) Width of die: 1400mm
C)Thickness: 12-20mm
D) Material: 5CrNiMo, higher quality alloy
three, Vacuum calibrating and forming table
Max. Calibrating width: 1450mm
Calibrating table size: 2000mm
Vacuum pump electrical power: five.5kw*two models
Max. Exhausting quantity: 80m3/min
H2o pump electricity: 4kw
four, CZPT bracket
A) Total length of roller bracket 5000mm
B) CZPT Roller
Diameter: Ø 63mm
Length: 1320mm
five, Haul-off unit
Max. Pulling width: 1450mm
Max pulling thickness: 20mm
Pair roller qty: 7 pairs
CZPTn motor energy: 5.5kw
6, Transverse reducing bracket
Rack variety synchronize urgent unit
Unique design and style flat slicing motor: two.2kW
With non-pole cylinder still left and proper shifting method
If you want far more specifics about this Wpc Crust Foam Board production line please contact us.
| Parts | Quantity |
| 1,Conical double screw extruder SJSZ-80/156 | 1 established |
| 2,Extruder CZPT | one set |
| 3,Vacuum calibrating and forming table | one set |
| four,ZS-1450 CZPT bracket | 1 established |
| 5,Haul-off unit | 1 set |
| 6, Transverse cutting bracket | one set |
| seven, Dropper for the completed merchandise | 1 set |
| eight, Manage method | 1 established |
CZPT CZPTs:
- Payment CZPT: 30% for prepayment by T/T, 70% for well balanced payment by T/T, or L/C can be satisfactory
- Delivery Time: forty times following receipt of prepayment.
- Packing Technique: Packing movie or picket scenario
- Assured Time: twelve months
CZPT Examination and Right after Support
- When equipment completed, we will invited consumer appear to our manufacturing unit to check the device and do the equipment take a look at. If machine is ok, then consumer pay for the equilibrium. And inspect device load the container.
- When machine comes client’s factory, if client wants, we will send 1-two engineer to client’s manufacturing facility do the equipment set up and running examination, and also prepare the neighborhood employee how to work and sustain the machine. It is chargeable.
