{"id":1304,"date":"2020-10-15T19:52:29","date_gmt":"2020-10-15T19:52:29","guid":{"rendered":"https:\/\/pistonpumps.top\/hongda-truck-mounted-concrete-pump-with-boom\/"},"modified":"2020-10-15T19:52:29","modified_gmt":"2020-10-15T19:52:29","slug":"hongda-truck-mounted-concrete-pump-with-boom","status":"publish","type":"post","link":"https:\/\/pistonpumps.top\/ru\/hongda-truck-mounted-concrete-pump-with-boom\/","title":{"rendered":"Hongda Truck-Mounted Concrete Pump with Boom"},"content":{"rendered":"<p><img decoding=\"async\" style=\"height:auto\" title=\"Hongda Truck-Mounted Concrete Pump with Boom \" src=\"http:\/\/img.hzpt.com\/uploads\/images\/ZHMedical\/Vacuum-pump-5.jpg\" alt=\"Hongda Truck-Mounted Concrete Pump with Boom \" \/><\/p>\n<p>\n<p><strong><strong>Major parameter of 52m concrete pump with boom <\/strong><\/strong><br \/><strong><strong>from ZheJiang   CZPT Team<\/strong><\/strong><br \/>A brief introduction of CZPT sequence concrete pump truck with increase<\/p>\n<p>Bringing in superior experience both at house and abroad, HONGDA concrete pump with increase is produced by implementing modern day sophisticated laptop simulation techniques and systematically analyzing the impact situation of the growth tiredness lifestyle since of the modify of different parameters such as pressure, displacement, all-natural frequency etc. The series products gained numerous patents on boom constructions optimization and hydraulic programs layout.<\/p>\n<p>Best merchandise top quality handle, perfect solution generating, and absolutely adequate top quality inspection make HONGDA pump truck attain Chinas major amount and intercontinental superior degree.<\/p>\n<p>\u00a0<\/p>\n<p>Item technological parameters and desk<\/p>\n<table>\n<tbody>\n<tr>\n<td colspan=\"5\"><strong><strong>parameter of 52m concrete pump <\/strong><\/strong><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" rowspan=\"2\"><strong><strong>\u041f\u0440\u0435\u0434\u043c\u0435\u0442\u044b<\/strong><\/strong><\/td>\n<td rowspan=\"2\"><strong><strong>\u0423\u0441\u0442\u0440\u043e\u0439\u0441\u0442\u0432\u043e<\/strong><\/strong><\/td>\n<td colspan=\"2\"><strong><strong>\u041f\u0430\u0440\u0430\u043c\u0435\u0442\u0440\u044b<\/strong><\/strong><\/td>\n<\/tr>\n<tr>\n<td><strong><strong>52m Howo<\/strong><\/strong><\/td>\n<td><strong><strong>52m Isuzu<\/strong><\/strong><\/td>\n<\/tr>\n<tr>\n<td rowspan=\"18\"><strong><strong>parameter in work situation<\/strong><\/strong><\/td>\n<td>Theoretical Pumping Capacity<\/td>\n<td>\u043c3\/\u0447<\/td>\n<td>\u0441\u0442\u043e \u043f\u044f\u0442\u044c\u0434\u0435\u0441\u044f\u0442<\/td>\n<td>150<\/td>\n<\/tr>\n<tr>\n<td>Theoretical Pumping Stress<\/td>\n<td>\u041c\u043f\u0430<\/td>\n<td>8.5<\/td>\n<td>8.five<\/td>\n<\/tr>\n<tr>\n<td>\u0421\u043f\u043e\u0441\u043e\u0431\u043d\u043e\u0441\u0442\u044c \u043f\u0440\u044b\u0433\u0443\u043d\u0430<\/td>\n<td>\u041b<\/td>\n<td>\u0441\u0435\u043c\u044c\u0441\u043e\u0442<\/td>\n<td>\u0441\u0435\u043c\u044c\u0441\u043e\u0442<\/td>\n<\/tr>\n<tr>\n<td>Feeding Peak<\/td>\n<td>\u043c\u043c<\/td>\n<td>1400<\/td>\n<td>1400<\/td>\n<\/tr>\n<tr>\n<td>Distributing Valve Type<\/td>\n<td>\u00a0<\/td>\n<td>S-pipe valve<\/td>\n<td>S-pipe valve<\/td>\n<\/tr>\n<tr>\n<td>Max. Distributing Radius<\/td>\n<td>\u043c<\/td>\n<td>47.8<\/td>\n<td>forty seven.eight<\/td>\n<\/tr>\n<tr>\n<td>Max. Distributing Height<\/td>\n<td>\u043c<\/td>\n<td>fifty one.eight<\/td>\n<td>fifty one.8<\/td>\n<\/tr>\n<tr>\n<td>Max. Distributing Depth<\/td>\n<td>\u043c<\/td>\n<td>39.\u0432\u043e\u0441\u0435\u043c\u044c<\/td>\n<td>39.\u0432\u043e\u0441\u0435\u043c\u044c<\/td>\n<\/tr>\n<tr>\n<td>Height of Distributing Increase When Stretched<\/td>\n<td>\u043c\u043c<\/td>\n<td>9400<\/td>\n<td>9400<\/td>\n<\/tr>\n<tr>\n<td>Length between Front Landing Legs<\/td>\n<td>\u043c\u043c<\/td>\n<td>15715<\/td>\n<td>15715<\/td>\n<\/tr>\n<tr>\n<td>Distance amongst Rear Landing Legs<\/td>\n<td>\u043c\u043c<\/td>\n<td>10650<\/td>\n<td>10650<\/td>\n<\/tr>\n<tr>\n<td>Length amongst Front and Rear Landing Legs<\/td>\n<td>\u043c\u043c<\/td>\n<td>1571<\/td>\n<td>1571<\/td>\n<\/tr>\n<tr>\n<td>Diameter\u00a0 of Conveying Pipe<\/td>\n<td>\u043c\u043c<\/td>\n<td>\u0441\u0442\u043e \u0434\u0432\u0430\u0434\u0446\u0430\u0442\u044c \u043f\u044f\u0442\u044c<\/td>\n<td>125<\/td>\n<\/tr>\n<tr>\n<td>Size of Tail Hose<\/td>\n<td>\u043c<\/td>\n<td>3<\/td>\n<td>3<\/td>\n<\/tr>\n<tr>\n<td>Rotary Selection of Distributing Growth<\/td>\n<td>\u00a0<\/td>\n<td>365\u00b0<\/td>\n<td>365\u00b0<\/td>\n<\/tr>\n<tr>\n<td>Variety of Increase Sections<\/td>\n<td>\u00a0<\/td>\n<td>5<\/td>\n<td>5<\/td>\n<\/tr>\n<tr>\n<td>Rotary Angle of Every Increase Segment<\/td>\n<td>\u00b0<\/td>\n<td>ninety\/a hundred and eighty\/one hundred eighty\/180\/270<\/td>\n<td>90\/180\/one hundred eighty\/a hundred and eighty\/270<\/td>\n<\/tr>\n<tr>\n<td>Distant-control Distance<\/td>\n<td>\u043c<\/td>\n<td>\u0434\u0432\u0435\u0441\u0442\u0438<\/td>\n<td>\u0434\u0432\u0435\u0441\u0442\u0438<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"17\"><strong><strong>parameter in driving issue<\/strong><\/strong><\/td>\n<td>Max. Traveling Pace<\/td>\n<td>\u043a\u043c\/\u0447<\/td>\n<td>80<\/td>\n<td>89<\/td>\n<\/tr>\n<tr>\n<td>Min. Turning Radius<\/td>\n<td>\u043c\u043c<\/td>\n<td>12500<\/td>\n<td>12000<\/td>\n<\/tr>\n<tr>\n<td>Brake Length<\/td>\n<td>\u043c<\/td>\n<td>10<\/td>\n<td>10<\/td>\n<\/tr>\n<tr>\n<td>Technique Angle<\/td>\n<td>\u00b0<\/td>\n<td>16<\/td>\n<td>\u0448\u0435\u0441\u0442\u043d\u0430\u0434\u0446\u0430\u0442\u044c<\/td>\n<\/tr>\n<tr>\n<td>Departure Angle<\/td>\n<td>\u00b0<\/td>\n<td>11<\/td>\n<td>\u0434\u0432\u0435\u043d\u0430\u0434\u0446\u0430\u0442\u044c<\/td>\n<\/tr>\n<tr>\n<td><strong><strong>Chassis Design<\/strong><\/strong><\/td>\n<td><strong><strong>for reference<\/strong><\/strong><\/td>\n<td><strong><strong>HOWO ZZ5437S5067C1<\/strong><\/strong><\/td>\n<td><strong><strong>\u0418\u0421\u0423\u0417\u0423<\/strong>\u00a0\u00a0<strong>CYH51Y\/CYH52Y<\/strong><\/strong><\/td>\n<\/tr>\n<tr>\n<td>\u00a0Wheel Foundation between the 1st and the 2nd Axle<\/td>\n<td>\u043c\u043c<\/td>\n<td>1800<\/td>\n<td>1850<\/td>\n<\/tr>\n<tr>\n<td>Wheel Foundation in between the 2nd and the 3rd Axle<\/td>\n<td>\u043c\u043c<\/td>\n<td>5000<\/td>\n<td>4605<\/td>\n<\/tr>\n<tr>\n<td>Wheel Foundation in between the Third and the Fourth Axle<\/td>\n<td>\u043c\u043c<\/td>\n<td>1350<\/td>\n<td>1310<\/td>\n<\/tr>\n<tr>\n<td>Entrance Tread<\/td>\n<td>\u043c\u043c<\/td>\n<td>2571<\/td>\n<td>2065<\/td>\n<\/tr>\n<tr>\n<td>Rear Tread<\/td>\n<td>\u043c\u043c<\/td>\n<td>1830<\/td>\n<td>1850<\/td>\n<\/tr>\n<tr>\n<td>Max. Engine Power<\/td>\n<td>\u043a\u0412\u0442<\/td>\n<td>275(2200r\/min)<\/td>\n<td>287(1800r\/min)\/ \u00a0294 Euro IV<\/td>\n<\/tr>\n<tr>\n<td>Max Motor Torque<\/td>\n<td>n.m<\/td>\n<td>1500(1100-1600r\/min)<\/td>\n<td>1863(1100r\/min)<\/td>\n<\/tr>\n<tr>\n<td>Max. Grade Potential<\/td>\n<td>%<\/td>\n<td>37<\/td>\n<td>\u0442\u0440\u0438\u0434\u0446\u0430\u0442\u044c<\/td>\n<\/tr>\n<tr>\n<td>Fuel Use Restrict<\/td>\n<td>L\/100km<\/td>\n<td>38<\/td>\n<td>34<\/td>\n<\/tr>\n<tr>\n<td>Total Dimension (L \u00d7W\u00d7 H)<\/td>\n<td>\u043c\u043c<\/td>\n<td>13990x2500x4000<\/td>\n<td>13950\u00d72490\u00d74000<\/td>\n<\/tr>\n<tr>\n<td>Total-load Overall Bodyweight<\/td>\n<td>\u043a\u0433<\/td>\n<td>42000<\/td>\n<td>41000<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Other merchandise<\/p>\n<p>\u041f\u0440\u043e\u0444\u0438\u043b\u044c \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u0438<br \/>We hongda group has a history of much more than 20 years generating and saling asphalt mixing plant. Our solution has exported to Kazakhstan, CZPTia, Algeria, Russia, Egypt, Saudi Abrabia, Afghanistan,Equatorial Guinea and many others. We think we can satisfy your demand for the asphalt mixing plant.\u00a0\u00a0<\/p>\n<p>Manufacturing manufacturing facility<\/p>\n<p>Item high quality certification<\/p>\n<p>The business cooperation<\/p>\n<p>\u0427\u0430\u0441\u0442\u043e \u0437\u0430\u0434\u0430\u0432\u0430\u0435\u043c\u044b\u0435 \u0432\u043e\u043f\u0440\u043e\u0441\u044b<\/p>\n<p><strong>Q: Are you buying and selling business or company?<\/strong><\/p>\n<p>A: We are factory. We can style and company merchandise with our patent.<\/p>\n<p>Welcome to pay a visit to us to check it!massive concrete mixer<\/p>\n<p><strong>Q: What is actually your right after-sale provider?<\/strong><\/p>\n<p>A:twelve months guarantee for principal elements given that departure.<\/p>\n<p>On-internet site installation, debugging, staff instruction. Make positive that your employees work effectively and know every day routine maintenance properly.<\/p>\n<p><strong>Q:What is actually your shipping and delivery time?<\/strong><\/p>\n<p>A:The items will be sent in 30-45 days following the 30% of the total amout is paid out as deposit, and perhaps a tiny lengthier if occupied in the manufacturing facility.<\/p>\n<p><strong>Q. How long do you guarantee your concrete batching plant?<\/strong><\/p>\n<p>A:We shall guarantee that the commodity for 1 year, excluding the wearing elements, and we will supply our clients the sporting components all the time with favorable cost.<\/p>\n<p><strong>Q: What ought to I do if I expertise a problem on our tools?<\/strong><\/p>\n<p>A: You could e-mail us the pictures to present what occurs or phone us, and our provider line is available 24\/seven, and then we will suggestions you instantly. Also on-site technician service available as request.<\/p>\n<p><strong>\u00a0<\/strong><br \/>\u00a0                            <\/p>\n<p>\n<p><img decoding=\"async\" style=\"height:auto\" title=\"Hongda Truck-Mounted Concrete Pump with Boom \" src=\"http:\/\/img.hzpt.com\/uploads\/images\/ZHMedical\/Vacuum-pump-5.jpg\" alt=\"Hongda Truck-Mounted Concrete Pump with Boom \" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Major parameter of 52m concrete pump with boom from ZheJiang CZPT TeamA brief introduction of CZPT sequence concrete pump truck with increase Bringing in superior experience both at house and abroad, HONGDA concrete pump with increase is produced by implementing modern day sophisticated laptop simulation techniques and systematically analyzing the impact situation of the growth [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1304","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/posts\/1304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/comments?post=1304"}],"version-history":[{"count":0,"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/posts\/1304\/revisions"}],"wp:attachment":[{"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/media?parent=1304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/categories?post=1304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pistonpumps.top\/ru\/wp-json\/wp\/v2\/tags?post=1304"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}