PPR Fiber Pipe Extrusion Line

PPR Fiber Pipe Extrusion Line

PPR Fiber Pipe Extrusion Line

We are really skilled in making the PPR pipe production line. It developed by Hanhai business is highlighted of exclusive framework, large diploma of computerized, simple procedure and steady reliable ongoing manufacture overall performance. We have stock in our manufacturing facility, you can come to pay a visit to at any time.

The whole manufacturing line is composed of the pursuing 7 elements:

いいえ。

名前

1

Solitary screw extruder with automated feeding system

1セット

CZPT

1セット

三つ

真空校正タンク

1セット

4 飲料水冷却タンク     1セット

牽引装置

1セット

Slicing equipment

1セット

セブン

スタッカー

1セット

The pipe developed by our equipment has the average rigidity&power, good flexibility, creep resistant,environmental anxiety crack resistance and favorable very hot melting house.

押出機の設計 パイプ径
(ミリメートル)
発電能力
(kg/時)
Total Power
(kW/h)
SJ50 16~63年 one hundred~a hundred and fifty 75
SJ65 75~160 three hundred~350 160
SJ75 200~400 600~seven-hundred 280
SJ90 450~630 800~850 350
SJ120 710~1200 1200~1300 700
SJ150 1200~2000 1400~1500

Specifics Images:

one.One screw extruder with computerized feeding program

According to the requirements of different diameters, various wall thicknesses and distinct output of pipes, we have a lot of designs of special solitary screw extruders to pick from. It adopts a specially designed screw structure, which can evenly heat, plasticize PPR granules and extrude pipes .
(1)モーターメーカー:シーメンス
(2) CZPT manufacturer: Delta
(3) Contactor model: Siemens
(four) Relay brand name: Omron
(five) Breaker manufacturer: Schneider
(six) Substance of screw and barrel: 38CrMoAlA.
(seven) Heating method: Ceramic or solid aluminum heating

2. CZPT

The mould is produced of large-top quality alloy steel, the inside circulation channel is chrome-plated and highly polished, which is dress in-resistant and corrosion-resistant With the particular sizing sleeve, the product generation pace is hight and the area of the pipe is excellent.

(1) Substance: 40GR

(two) Dimensions: CZPT

3.Vacuum calibrating tank

The calibrating and cooling tank can calibrate and cool the pipe from the mould.

(1) Vacuum pump power : 4 kw 
(two) CZPT metal materials: 1Cr18NiTi
(3) Diameter of tank : CZPT
(four) Size of tank: 6 m

4.Water cooling tank
(1) Drinking water pump power: 4 kw
(two) Spray cooling: Abdominal muscles nozzle CZPT steel pipe
(3) Strategy: Enforced spraying
(4) Length of tank: 6 m 

five.Haul-off machine

The haul-off device can transportation PPR pipe to reducing equipment.

(1) Hauling power: one.5 kw 

(2) Clamping fashion: CZPT clamping
(three) Transducer: Siemens transducer
(4) Hauling monitor type: CZPT block
(5) Successful clamping size 1800 mm

six.Slicing device:

The special reducing machine for PPR pipe adopts rotary clamping device, is ideal for diverse pipe diameters, avoids the difficulties of often altering clamping system.

(one) Cutting motor electricity: 1.5 kw

(two) Slicing scope: CZPT 

(3) Control means: CZPT control

7.Stacker:

It is utilised to keep pipes and can unload pipes instantly.

(one) Duration: 6000 mm

(two) Content: CZPT metal
(three) Unloading technique: CZPT unloading

Ultimate CZPT

You just explain to me what device you want,let us do the relaxation function:

1. Design and manufacture suitble equipment for you.

2. Ahead of shipping, we will check the equipment right up until you are totally satisfied. (You can arrive to   our manufacturing facility to inspect the working generation line.)

three. Shipping and delivery.

4. We will provide following-revenue service

(1)エリア設置および試運転 

(2) Area coaching your workers 
(three) Field upkeep and repair provider

(four) Totally free Spare Elements  

(5)オンラインビデオ/オンライン専門サポート

 

Evaluations by clients:

Cooperation Makes

 

よくある質問:

one.Are you manufacturer or buying and selling business?
We are maker.

2.Why select us?
We have twenty many years knowledge for producing device.We can organize for you to visit our nearby customer’s manufacturing unit.

three.Shipping time: thirty~40 days.

4.Payment phrases:
  30% of whole sum must be compensated by T/T as down payment, the equilibrium (70% of whole volume) ought to be paid out just before supply by T/T or irrevocable L/C(at sight).

5.Following Warranty Services:  Long-phrase specialized assistance Spare parts Field servicing and fix provider

お問い合わせ:

 
 
 

 

 
 
 

 
 

PPR Fiber Pipe Extrusion Line

タグ: