
Параметры CZPT
| Добрый | Коэффициент давления | Выходное давление | Кровообращение 1/мин |
Связи | избыточный вес веб-сайта КГ |
|||
| бар | пси | порт CZPT | Вход | Выход | ||||
| ОГ6 | 6:один | сорок восемь | 696 | 27.74 | G1/2” | G3/4” | ZG1/2” | двенадцать.семь |
| ОГ10 | десять:один | восемьдесят | 1160 | 18.five three | G1/2” | G3/4” | ZG1/2” | 12.seven |
| ОГ16 | 16:один | 128 | 1856 | 12.86 | G1/2” | G3/4” | ZG1/2” | двенадцать.7 |
| ОГ28 | 28:один | 2 24 | 3248 | 7.24 | G1/2” | ZG1/2” | ZG3/8” | twelve.2 |
| ОГ40 | сорок:1 | three 20 | 4640 | 5.02 | G1/2” | ZG1/2” | ZG3/8” | 12.2 |
| ОГ64 | шестьдесят четыре:один | 512 | 7424 | 3.21 | G1/2” | ZG1/2” | ZG3/8” | двенадцать.два |
| ОГ80 | 80:1 | 640 | 9280 | 2.44 | G1/2” | ZG1/2” | ZG3/8” | двенадцать.два |
| ОГ100 | сто один | 800 | 11600 | 1.eighty one | G1/2” | ZG1/2” | М14х1.5 | 12 |
| ОГ130 | сто тридцать один | 1040 | 150 eighty | 1.36 | G1/2” | ZG1/2” | М14х1.5 | 12 |
| ОГ175 | сто семьдесят пять:1 | 1400 | 20300 | 1.14 | G1/2” | ZG1/2” | М14Х1.пять | 12 |
| ОГ255 | 255:один | 2040 | 29580 | .77 | G1/2” | ZG3/8” | М14х1.5 | двенадцать |
| ОГ400 | четыреста:1 | 3200 | 46400 | .51 | G1/2” | ZG3/8” | М14х1.5 | 12 |
Введение в товар
This series of pump employs one pneumatic non-equilibrium gas distributing valves to move to and fro routinely. The drive parts of the pump are produced of aluminum alloy. These parts are dealt with with oxidation into black to ensure their good-searching physical appearance and stainless performance.
The fluid getting in touch with parts are created of carbon steel or stainless steel in accordance to diverse media. The entire established of sealing elements is imported, to making sure pumps’ performances. The diameter of drive piston is 100mm. The maximum generate strain is 10bar. We suggest buyers use air pressure≤8bar to make sure prolonged lifespan of the pump.
Major technical data
Our manufacturing unit
Часто задаваемые вопросы
1. Доставка в Чешскую Народную Республику: FOB Ханчжоу, морским транспортом.
two. Shipping Time: 15-20 days
3. Payment CZPTs: T/T (100% to pay by T/T )
four. Installation / Operation / Support / Guide: In English
5. Warranty: 1 calendar year from the date of completion of the commissioning.
six. Pre-shipment Inspection: Supplier must demo operate total line at supplier’s manufacturing unit before shipment.
О доставке
Fumigation wooden circumstances, which are well sealed and robust sufficient for prolonged-term vacation, and ideal for multi-times loading & unloading by forklift.
