
Параметър на CZPT
| Вид | Съотношение на налягането | Изходно налягане | Тираж 1/мин |
Връзки | Излишно тегло в мрежата КГ |
|||
| бар | пси | CZPT port | Вход | Аутлет | ||||
| OG6 | 6: едно | четиридесет и осем | 696 | 27.74 | G1/2” | G3/4” | ZG1/2” | дванадесет.седем |
| OG10 | десет:едно | осемдесет | 1160 | 18.five three | G1/2” | G3/4” | ZG1/2” | 12.seven |
| OG16 | 16: едно | 128 | 1856 | 12.86 | G1/2” | G3/4” | ZG1/2” | twelve.7 |
| OG28 | 28: едно | 2 24 | 3248 | 7.24 | G1/2” | ZG1/2” | ZG3/8” | twelve.2 |
| OG40 | четиридесет:1 | three 20 | 4640 | 5.02 | G1/2” | ZG1/2” | ZG3/8” | 12.2 |
| OG64 | шестдесет и четири: едно | 512 | 7424 | 3.21 | G1/2” | ZG1/2” | ZG3/8” | twelve.two |
| OG80 | 80:1 | 640 | 9280 | 2.44 | G1/2” | ZG1/2” | ZG3/8” | twelve.two |
| OG100 | сто:едно | 800 | 11600 | 1. осемдесет и едно | G1/2” | ZG1/2” | М14Х1.5 | 12 |
| OG130 | сто тридесет и едно | 1040 | 150 eighty | 1.36 | G1/2” | ZG1/2” | М14Х1.5 | 12 |
| OG175 | сто седемдесет и пет:1 | 1400 | 20300 | 1.14 | G1/2” | ZG1/2” | M14X1.5 | 12 |
| OG255 | 255:едно | 2040 | 29580 | .77 | G1/2” | ZG3/8” | М14Х1.5 | дванадесет |
| OG400 | четиристотин:1 | 3200 | 46400 | .51 | G1/2” | ZG3/8” | М14Х1.5 | 12 |
Въведение в артикула
This series of pump employs one pneumatic non-equilibrium gas distributing valves to move to and fro routinely. The drive parts of the pump are produced of aluminum alloy. These parts are dealt with with oxidation into black to ensure their good-searching physical appearance and stainless performance.
The fluid getting in touch with parts are created of carbon steel or stainless steel in accordance to diverse media. The entire established of sealing elements is imported, to making sure pumps’ performances. The diameter of drive piston is 100mm. The maximum generate strain is 10bar. We suggest buyers use air pressure≤8bar to make sure prolonged lifespan of the pump.
Major technical data
Нашето производствено звено
ЧЗВ
едно. Доставка CZPT: FOB Ханчжоу, с кораб
two. Shipping Time: 15-20 days
3. Payment CZPTs: T/T (100% to pay by T/T )
four. Installation / Operation / Support / Guide: In English
5. Warranty: 1 calendar year from the date of completion of the commissioning.
six. Pre-shipment Inspection: Supplier must demo operate total line at supplier’s manufacturing unit before shipment.
Относно доставката
Fumigation wooden circumstances, which are well sealed and robust sufficient for prolonged-term vacation, and ideal for multi-times loading & unloading by forklift.
