
CZPT-parameter van CZPT
| Vriendelijk | Drukverhouding | Uitlaatdruk | Bloedsomloop 1/min |
Verbindingen | Web overgewicht KG |
|||
| bar | psi | CZPT port | Inlaat | Outlet | ||||
| OG6 | 6:1 | achtenveertig | 696 | 27.74 | G1/2” | G3/4” | ZG1/2” | twaalf.zeven |
| OG10 | tien:één | tachtig | 1160 | 18.five three | G1/2” | G3/4” | ZG1/2” | 12.seven |
| OG16 | 16:1 | 128 | 1856 | 12.86 | G1/2” | G3/4” | ZG1/2” | twelve.7 |
| OG28 | 28:1 | 2 24 | 3248 | 7.24 | G1/2” | ZG1/2” | ZG3/8” | twelve.2 |
| OG40 | veertig:1 | three 20 | 4640 | 5.02 | G1/2” | ZG1/2” | ZG3/8” | 12.2 |
| OG64 | vierenzestig:1 | 512 | 7424 | 3.21 | G1/2” | ZG1/2” | ZG3/8” | twelve.two |
| OG80 | 80:1 | 640 | 9280 | 2.44 | G1/2” | ZG1/2” | ZG3/8” | twelve.two |
| OG100 | honderd:één | 800 | 11600 | 1.eighty one | G1/2” | ZG1/2” | M14X1.5 | 12 |
| OG130 | honderd eenendertig | 1040 | 150 eighty | 1.36 | G1/2” | ZG1/2” | M14X1.5 | 12 |
| OG175 | honderdvijfenzeventig:1 | 1400 | 20300 | 1.14 | G1/2” | ZG1/2” | M14X1.5 | 12 |
| OG255 | 255:1 | 2040 | 29580 | .77 | G1/2” | ZG3/8” | M14X1.5 | twaalf |
| OG400 | vierhonderd:1 | 3200 | 46400 | .51 | G1/2” | ZG3/8” | M14X1.5 | 12 |
Inleiding van het artikel
This series of pump employs one pneumatic non-equilibrium gas distributing valves to move to and fro routinely. The drive parts of the pump are produced of aluminum alloy. These parts are dealt with with oxidation into black to ensure their good-searching physical appearance and stainless performance.
The fluid getting in touch with parts are created of carbon steel or stainless steel in accordance to diverse media. The entire established of sealing elements is imported, to making sure pumps’ performances. The diameter of drive piston is 100mm. The maximum generate strain is 10bar. We suggest buyers use air pressure≤8bar to make sure prolonged lifespan of the pump.
Major technical data
Our manufacturing unit
Veelgestelde vragen
1. Levering CZPT: FOB Hangzhou, per schip
two. Shipping Time: 15-20 days
3. Payment CZPTs: T/T (100% to pay by T/T )
four. Installation / Operation / Support / Guide: In English
5. Warranty: 1 calendar year from the date of completion of the commissioning.
six. Pre-shipment Inspection: Supplier must demo operate total line at supplier’s manufacturing unit before shipment.
Over verzending
Fumigation wooden circumstances, which are well sealed and robust sufficient for prolonged-term vacation, and ideal for multi-times loading & unloading by forklift.
